450T Gird Bridge Comissionning

Author: Supro Trailer   Date: 2018.09.07

Supro Girder Bridge Trailer

Supro Trailer Produce the Girder bridge for the small and heavy cargo transport, such as the Transformer. The Girder bridge combine with Hydrualic modular trailer ( we could make our Girder bridge to combine with Goldhofer, Nicolas and Scheuerle modular trailer). 

Drawing of the Girder bridge

The Girder bridge has main four sections. 

1. The Front supporting cylinder and platform. 

It has a supporting cylinder and an operation platform. 

2. The middle loading beam and side beams. 

The Girder bridge has a weight sharing beams on the modular trailer. Then after the weight sharing beam, it is side beams. And in the middle of the Girder bridge, it is loading beams which has hang beams.

3. Hang beams. 

The hang beams load the cargo, and the positions are flexible. 

4. Rear supporting cylinder and steering cylinders. 

The rear part of the Girder bridge is a big cylinder to lift the Girder bridge, and also it has fours steering cylinders to help the steering. 

Drawing of the Supro Girder bridge

500 tons girder bridge trailer

Video of the Girder bridge

whatsapp